A1 DEVELOPMENT OF SAFE ROADS – Oct 2023

Go-Barry SMTB 200 – 204 m length
Execution time – 2.5 weeks
Client – Dostal / Rijkswaterstaat

On the A1, the Go-Barry drove on the hard shoulder and an infiltration sewer could be safely constructed on the verge. During the nights, the Go-Barry was located in lane 2 to enable the supply of materials.