A2 BRIDGE WESSEM – 2023

Go Barry version SMTB200 204m length
Execution time 3 weeks

The Go Barry was used on the A2 as a temporary barrier during the replacement of the existing barrier on the Maas Bridge, where the Go Barry protected the transition from new to old barrier during the day and ensured a safe workplace during the work.