A9 SIDE CHANNEL C – 2021

Go Barry version 0.5 and 1.0 24m length
Execution time 5 weeks

The Go Barry was used as temporary barriers on the bridge deck and was moved when the bridge had to open. This allowed safe movement of the bridge lanes during maintenance work.