Go Barry version 0.5 42m length
Implementation period 6 8 months

Use of the Go Barry as a dynamic barrier that moves along with piling work. The Go Barry drives on the grass concrete tiles next to the provincial road to protect the piling work in the slope of the road. The barrier is moved 30 to 40 meters every day.